All Article Properties:
{
"access_control": false,
"status": "publish",
"objectType": "Article",
"id": "1532981",
"signature": "Article:1532981",
"url": "https://staging.dailymaverick.co.za/article/2023-01-18-hand-to-mouth-south-africas-power-lifeline-frays-as-eskom-scrambles-for-diesel/",
"shorturl": "https://staging.dailymaverick.co.za/article/1532981",
"slug": "hand-to-mouth-south-africas-power-lifeline-frays-as-eskom-scrambles-for-diesel",
"contentType": {
"id": "1",
"name": "Article",
"slug": "article"
},
"views": 0,
"comments": 17,
"preview_limit": null,
"excludedFromGoogleSearchEngine": 0,
"title": "Hand-to-Mouth: South Africa’s power lifeline frays as Eskom scrambles for diesel",
"firstPublished": "2023-01-18 23:54:08",
"lastUpdate": "2023-01-18 23:54:08",
"categories": [
{
"id": "9",
"name": "Business Maverick",
"signature": "Category:9",
"slug": "business-maverick",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/business-maverick/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
},
{
"id": "29",
"name": "South Africa",
"signature": "Category:29",
"slug": "south-africa",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/south-africa/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "Daily Maverick is an independent online news publication and weekly print newspaper in South Africa.\r\n\r\nIt is known for breaking some of the defining stories of South Africa in the past decade, including the Marikana Massacre, in which the South African Police Service killed 34 miners in August 2012.\r\n\r\nIt also investigated the Gupta Leaks, which won the 2019 Global Shining Light Award.\r\n\r\nThat investigation was credited with exposing the Indian-born Gupta family and former President Jacob Zuma for their role in the systemic political corruption referred to as state capture.\r\n\r\nIn 2018, co-founder and editor-in-chief Branislav ‘Branko’ Brkic was awarded the country’s prestigious Nat Nakasa Award, recognised for initiating the investigative collaboration after receiving the hard drive that included the email tranche.\r\n\r\nIn 2021, co-founder and CEO Styli Charalambous also received the award.\r\n\r\nDaily Maverick covers the latest political and news developments in South Africa with breaking news updates, analysis, opinions and more.",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
},
{
"id": "387188",
"name": "Maverick News",
"signature": "Category:387188",
"slug": "maverick-news",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/maverick-news/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
}
],
"content_length": 8595,
"contents": "<span style=\"font-weight: 400;\">In the past two years, Eskom has been forced to rely increasingly on the open-cycle gas turbines (OCGTs) — which were intended only for dire emergencies or use during peak demand periods — because of a steadily increasing number of breakdowns within its ageing coal-fired power fleet.</span>\r\n\r\n<span style=\"font-weight: 400;\">In the past few months, the OCGTs have become essential in the face of the loss of 4,500MW of generation capacity due to problems at Medupi and Kusile, Eskom’s two newest coal-fired power plants, and a life-extension refurbishment at Koeberg, its nuclear power station. </span>\r\n\r\n<p><img loading=\"lazy\" class=\"size-full wp-image-1532889\" src=\"https://www.dailymaverick.co.za/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays.jpg\" alt=\"\" width=\"720\" height=\"360\" /> Gourikwa Power Station is a 740MW oil fired power project. It is located in Western Cape, South Africa. Photo: Eskom</p>\r\n\r\n<span style=\"font-weight: 400;\">Eskom chief operating officer Jan Oberholzer says this combined outage equates to about five stages of load shedding. </span>\r\n\r\n<span style=\"font-weight: 400;\">Kusile Units 1, 2, 3 and 5 — which account for nearly 3,000MW of the amount — will be unavailable until the end of this year, he told </span><i><span style=\"font-weight: 400;\">EE Business Intelligence</span></i><span style=\"font-weight: 400;\">. The complex life extension of Units 1 and 2 at Koeberg will only be complete by March 2024, if all goes well. Medupi Unit 4 is only scheduled for return-to-service by September 2024 following a hydrogen explosion in August 2021.</span>\r\n\r\n<span style=\"font-weight: 400;\">When you add this large, combined outage to the country’s existing power generation gap of 4,000 to 6,000MW declared by Eskom more than three years ago — which has still not been addressed — it is clear that South Africa is teetering on the edge of an electricity emergency.</span>\r\n<h4><b>The diesel emergency</b></h4>\r\n<span style=\"font-weight: 400;\">Eskom’s management team drew the ire of government in November 2022 when it declared that the utility had run out of diesel and could not afford to buy more, having spent roughly double the R6-billion diesel budget for the financial year ending 31 March 2023.</span>\r\n\r\n<span style=\"font-weight: 400;\">When no further funds from Treasury materialised, Eskom chief financial officer Calib Cassim managed to scrape together R1.5-billion intended for other purposes from his budget for the remainder of the year, to immediately buy 50 million litres of diesel from PetroSA. </span><span style=\"font-weight: 400;\">\r\n</span>\r\n\r\n<span style=\"font-weight: 400;\">That provided enough diesel to keep the OCGTs running as needed through December 2022. As the fuel ran out, Cassim came up with yet another R1.5-billion from Eskom’s coffers for a further 50.4-million litres of diesel.</span>\r\n\r\n<span style=\"font-weight: 400;\">According to Oberholzer, this should last until the end of January 2023. “From an operational point of view, I can tell you we need diesel,” he told </span><i><span style=\"font-weight: 400;\">EE Business Intelligence</span></i><span style=\"font-weight: 400;\">. “We need at least — and this is based on certain assumptions — an additional 200 million litres of diesel to take us towards the end of March 2023. It may be less and it may be even more, it all depends on what’s going to happen in respect of unplanned breakdowns. This is the best assumption we have, based on the outlook ahead”, he said.</span>\r\n\r\n<span style=\"font-weight: 400;\">Cassim says that this would cost Eskom another R6-billion. When added to the eleventh hour R3-billion which he has just coughed up, and the previous diesel spend of about R12-billion, the utility’s diesel spend for the full financial year 2022/23 will amount to about R21-billion. This is much more than double that of the 2021/2022 financial year, when Eskom spent R8-billion on diesel.</span>\r\n\r\n<span style=\"font-weight: 400;\">It is easy to see that government is very upset by the financial and political consequences, as finance minister Enoch Godongwana declared in Davos on 16 January 2023 that, “I don’t think Eskom has a diesel problem, I think it has a management problem.”</span>\r\n<h4><b>The cost impact of load shedding</b></h4>\r\n<span style=\"font-weight: 400;\">But despite the prohibitive cost of diesel, there is widespread consensus that the burden of severe load shedding on the economy is much higher.</span>\r\n\r\n<span style=\"font-weight: 400;\">Estimates vary widely. However, based on 11,797GWh (gigawatt hours) of unserved electricity in the 2022 calendar year calculated from load shedding data from </span><a href=\"https://sepush.co.za/\"><span style=\"font-weight: 400;\">EskomSePush</span></a><span style=\"font-weight: 400;\">, and a very low assumption of R10/kWh for unserved energy suggested by Eskom, the total cost to the economy during the year would have been R115-billion.</span>\r\n\r\n<span style=\"font-weight: 400;\">This very conservative estimate does not account for the longer-term impacts of lost opportunities caused by extended load shedding on business, industry, agriculture and investment generally — and the money spent by households, business and industry on backup power systems.</span>\r\n\r\n<span style=\"font-weight: 400;\">Taking this into account, the cost of unserved electricity is likely to be much higher. At R50/kWh or even R85/kWh (if a study by the CSIR is anything to go by), the cost to the economy in 2022 would be more like R590-billion or R1-trillion respectively.</span>\r\n<h4><b>Rising OCGT usage</b></h4>\r\n<span style=\"font-weight: 400;\">The worst-case scenarios began to rear their head when Eskom was forced to implement Stage 6 load shedding on 11 January 2023 after 11 generation units unexpectedly broke down, taking the total amount of generation capacity offline to more than half of its installed capacity of about 46,000MW.</span>\r\n\r\n<span style=\"font-weight: 400;\">The load factor for Eskom’s OCGTs shot up to 48% at that time — meaning they were running flat out for about 12 hours of the day — and this is what enabled South Africa to avert crippling Stage 8 load shedding for the first time.</span>\r\n\r\n<span style=\"font-weight: 400;\">There are growing suggestions within the African National Congress that Eskom is deliberately implementing load shedding to scupper the ruling party’s chances in the 2024 national election. This is reinforced by utterances from minerals and energy minister Gwede Mantashe, who has claimed that Eskom is allowing more than 20,000MW of installed generation capacity to “stand idle”.</span>\r\n\r\n<span style=\"font-weight: 400;\">In reality, Eskom’s system operator implements load shedding to balance supply and demand on the grid, to avert a national blackout. The risk of this catastrophe is still seen as slim — provided that Eskom has enough diesel for the OCGTs, as well as other emergency levers at the disposal of the system operator.</span>\r\n\r\n<span style=\"font-weight: 400;\">Eskom’s own OCGT power plants — Ankerlig and Gourikwa — can generate up to 2,067MW of power, which mitigates two stages of load shedding. There are also two further OCGT power plants — Dedisa and Avon — owned and operated by independent power producers (IPPs), which can generate 1,005MW to avert a further one stage of load shedding. The IPP OCGTs are not part of Eskom’s diesel headache as they buy their own fuel.</span>\r\n\r\n<span style=\"font-weight: 400;\">A look at the load factor trend for Eskom’s OCGT usage over the past year tells the whole story. In financial year 2021/2022 it averaged 7%, and in the year to date it stands at 14%, according to Cassim. This compares with an OCGT usage load factor of just 6% factored into Eskom’s latest electricity tariff approved by Nersa for the 2023/24 financial year starting 1 April 2023.</span>\r\n<h4><b>The diesel outlook</b></h4>\r\n<span style=\"font-weight: 400;\">Now, once again, Eskom is peering into an abyss. Its second batch of diesel is expected to run out at the end of January 2023, and the Eskom board is looking at ways of coming up with the cash to keep the OCGTs running until the start of the new financial year on 1 April 2023. </span>\r\n\r\n<span style=\"font-weight: 400;\">“We now need to find cash somewhere, and as soon as possible. We have been given some actions that we are actively and urgently pursuing to see how we can obtain money to deal with this challenge of not being able to run the OCGTs”, Oberholzer said. </span>\r\n\r\n<span style=\"font-weight: 400;\">But none of the options on the table look like quick fixes. One option would be to receive some of the arrear debt of more than R50-billion which Eskom is currently owed by municipalities. Another would be the receipt of a hefty diesel tax rebate claimed from the South African Revenue Service (SARS), which Eskom’s financials show as just over R3-billion for the year ending 31 March 2022.</span>\r\n\r\n<span style=\"font-weight: 400;\">In terms of an amendment to Section 75 of the Customs and Excise Act, from 3 August 2022 Eskom is allowed Fuel and Road Accident Fund levy rebates totalling R4.04/litre of diesel used for power generation. From estimates of diesel fuel burned in Eskom’s OCGTs, this R3-billion could therefore easily have risen very substantially.</span>\r\n\r\n<span style=\"font-weight: 400;\">However, the diesel fuel rebates anticipated by Eskom have been disputed by SARS for more than a year, and the clock is ticking. </span>\r\n\r\n<span style=\"font-weight: 400;\">Oberholzer maintains that Eskom has no problems in sourcing diesel, although it is largely all imported, and South Africa has no official strategic reserves. </span><span style=\"font-weight: 400;\">\r\n</span><span style=\"font-weight: 400;\">The country as a whole uses between 12- to 14-billion litres of diesel a year, and at a load factor of 15%, the diesel used by the OCGTs operated by both Eskom and the IPPs would amount to about 1.13-billion litres — less than 10% of the total. </span><b>DM</b>\r\n\r\n<i><span style=\"font-weight: 400;\">Mariam Isa, independent journalist, and Chris Yelland, EE Business Intelligence.</span></i>\r\n\r\n<i><span style=\"font-weight: 400;\">© Copyright 2023 — EE Business Intelligence (Pty) Ltd. All rights reserved. This article may not be published without the written permission of EE Business Intelligence.</span></i>",
"teaser": "Hand-to-Mouth: South Africa’s power lifeline frays as Eskom scrambles for diesel",
"externalUrl": "",
"sponsor": null,
"authors": [
{
"id": "246679",
"name": "Mariam Isa and Chris Yelland",
"image": "",
"url": "https://staging.dailymaverick.co.za/author/mariam-isa-and-chris-yelland/",
"editorialName": "mariam-isa-and-chris-yelland",
"department": "",
"name_latin": ""
}
],
"description": "",
"keywords": [
{
"type": "Keyword",
"data": {
"keywordId": "2741",
"name": "Eskom",
"url": "https://staging.dailymaverick.co.za/keyword/eskom/",
"slug": "eskom",
"description": "Eskom is the primary electricity supplier and generator of power in South Africa. It is a state-owned enterprise that was established in 1923 as the Electricity Supply Commission (ESCOM) and later changed its name to Eskom. The company is responsible for generating, transmitting, and distributing electricity to the entire country, and it is one of the largest electricity utilities in the world, supplying about 90% of the country's electricity needs. It generates roughly 30% of the electricity used\r\nin Africa.\r\n\r\nEskom operates a variety of power stations, including coal-fired, nuclear, hydro, and renewable energy sources, and has a total installed capacity of approximately 46,000 megawatts. The company is also responsible for maintaining the electricity grid infrastructure, which includes power lines and substations that distribute electricity to consumers.\r\n\r\nEskom plays a critical role in the South African economy, providing electricity to households, businesses, and industries, and supporting economic growth and development. However, the company has faced several challenges in recent years, including financial difficulties, aging infrastructure, and operational inefficiencies, which have led to power outages and load shedding in the country.\r\n\r\nDaily Maverick has reported on this extensively, including its recently published investigations from the Eskom Intelligence Files which demonstrated extensive sabotage at the power utility. Intelligence reports obtained by Daily Maverick linked two unnamed senior members of President Cyril Ramaphosa’s Cabinet to four criminal cartels operating inside Eskom. The intelligence links the cartels to the sabotage of Eskom’s power stations and to a programme of political destabilisation which has contributed to the current power crisis.",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Eskom",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "4460",
"name": "SARS",
"url": "https://staging.dailymaverick.co.za/keyword/sars/",
"slug": "sars",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "SARS",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "15156",
"name": "Ipps",
"url": "https://staging.dailymaverick.co.za/keyword/ipps/",
"slug": "ipps",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Ipps",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "46800",
"name": "Treasury",
"url": "https://staging.dailymaverick.co.za/keyword/treasury/",
"slug": "treasury",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Treasury",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "124953",
"name": "Medupi",
"url": "https://staging.dailymaverick.co.za/keyword/medupi/",
"slug": "medupi",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Medupi",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "124954",
"name": "Kusile",
"url": "https://staging.dailymaverick.co.za/keyword/kusile/",
"slug": "kusile",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Kusile",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "125342",
"name": "Calib Cassim",
"url": "https://staging.dailymaverick.co.za/keyword/calib-cassim/",
"slug": "calib-cassim",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Calib Cassim",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "132317",
"name": "diesel",
"url": "https://staging.dailymaverick.co.za/keyword/diesel/",
"slug": "diesel",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "diesel",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "177614",
"name": "Jan Oberholzer",
"url": "https://staging.dailymaverick.co.za/keyword/jan-oberholzer/",
"slug": "jan-oberholzer",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Jan Oberholzer",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "192859",
"name": "Koeberg",
"url": "https://staging.dailymaverick.co.za/keyword/koeberg/",
"slug": "koeberg",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Koeberg",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "393907",
"name": "OCGTs",
"url": "https://staging.dailymaverick.co.za/keyword/ocgts/",
"slug": "ocgts",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "OCGTs",
"translations": null
}
}
],
"short_summary": null,
"source": null,
"related": [],
"options": [],
"attachments": [
{
"id": "99884",
"name": "The open-cycle gas turbine Gourikwa Power Station in the Western Cape. (Photo: Eskom)",
"description": "<span style=\"font-weight: 400;\">In the past two years, Eskom has been forced to rely increasingly on the open-cycle gas turbines (OCGTs) — which were intended only for dire emergencies or use during peak demand periods — because of a steadily increasing number of breakdowns within its ageing coal-fired power fleet.</span>\r\n\r\n<span style=\"font-weight: 400;\">In the past few months, the OCGTs have become essential in the face of the loss of 4,500MW of generation capacity due to problems at Medupi and Kusile, Eskom’s two newest coal-fired power plants, and a life-extension refurbishment at Koeberg, its nuclear power station. </span>\r\n\r\n[caption id=\"attachment_1532889\" align=\"aligncenter\" width=\"720\"]<img class=\"size-full wp-image-1532889\" src=\"https://www.dailymaverick.co.za/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays.jpg\" alt=\"\" width=\"720\" height=\"360\" /> Gourikwa Power Station is a 740MW oil fired power project. It is located in Western Cape, South Africa. Photo: Eskom[/caption]\r\n\r\n<span style=\"font-weight: 400;\">Eskom chief operating officer Jan Oberholzer says this combined outage equates to about five stages of load shedding. </span>\r\n\r\n<span style=\"font-weight: 400;\">Kusile Units 1, 2, 3 and 5 — which account for nearly 3,000MW of the amount — will be unavailable until the end of this year, he told </span><i><span style=\"font-weight: 400;\">EE Business Intelligence</span></i><span style=\"font-weight: 400;\">. The complex life extension of Units 1 and 2 at Koeberg will only be complete by March 2024, if all goes well. Medupi Unit 4 is only scheduled for return-to-service by September 2024 following a hydrogen explosion in August 2021.</span>\r\n\r\n<span style=\"font-weight: 400;\">When you add this large, combined outage to the country’s existing power generation gap of 4,000 to 6,000MW declared by Eskom more than three years ago — which has still not been addressed — it is clear that South Africa is teetering on the edge of an electricity emergency.</span>\r\n<h4><b>The diesel emergency</b></h4>\r\n<span style=\"font-weight: 400;\">Eskom’s management team drew the ire of government in November 2022 when it declared that the utility had run out of diesel and could not afford to buy more, having spent roughly double the R6-billion diesel budget for the financial year ending 31 March 2023.</span>\r\n\r\n<span style=\"font-weight: 400;\">When no further funds from Treasury materialised, Eskom chief financial officer Calib Cassim managed to scrape together R1.5-billion intended for other purposes from his budget for the remainder of the year, to immediately buy 50 million litres of diesel from PetroSA. </span><span style=\"font-weight: 400;\">\r\n</span>\r\n\r\n<span style=\"font-weight: 400;\">That provided enough diesel to keep the OCGTs running as needed through December 2022. As the fuel ran out, Cassim came up with yet another R1.5-billion from Eskom’s coffers for a further 50.4-million litres of diesel.</span>\r\n\r\n<span style=\"font-weight: 400;\">According to Oberholzer, this should last until the end of January 2023. “From an operational point of view, I can tell you we need diesel,” he told </span><i><span style=\"font-weight: 400;\">EE Business Intelligence</span></i><span style=\"font-weight: 400;\">. “We need at least — and this is based on certain assumptions — an additional 200 million litres of diesel to take us towards the end of March 2023. It may be less and it may be even more, it all depends on what’s going to happen in respect of unplanned breakdowns. This is the best assumption we have, based on the outlook ahead”, he said.</span>\r\n\r\n<span style=\"font-weight: 400;\">Cassim says that this would cost Eskom another R6-billion. When added to the eleventh hour R3-billion which he has just coughed up, and the previous diesel spend of about R12-billion, the utility’s diesel spend for the full financial year 2022/23 will amount to about R21-billion. This is much more than double that of the 2021/2022 financial year, when Eskom spent R8-billion on diesel.</span>\r\n\r\n<span style=\"font-weight: 400;\">It is easy to see that government is very upset by the financial and political consequences, as finance minister Enoch Godongwana declared in Davos on 16 January 2023 that, “I don’t think Eskom has a diesel problem, I think it has a management problem.”</span>\r\n<h4><b>The cost impact of load shedding</b></h4>\r\n<span style=\"font-weight: 400;\">But despite the prohibitive cost of diesel, there is widespread consensus that the burden of severe load shedding on the economy is much higher.</span>\r\n\r\n<span style=\"font-weight: 400;\">Estimates vary widely. However, based on 11,797GWh (gigawatt hours) of unserved electricity in the 2022 calendar year calculated from load shedding data from </span><a href=\"https://sepush.co.za/\"><span style=\"font-weight: 400;\">EskomSePush</span></a><span style=\"font-weight: 400;\">, and a very low assumption of R10/kWh for unserved energy suggested by Eskom, the total cost to the economy during the year would have been R115-billion.</span>\r\n\r\n<span style=\"font-weight: 400;\">This very conservative estimate does not account for the longer-term impacts of lost opportunities caused by extended load shedding on business, industry, agriculture and investment generally — and the money spent by households, business and industry on backup power systems.</span>\r\n\r\n<span style=\"font-weight: 400;\">Taking this into account, the cost of unserved electricity is likely to be much higher. At R50/kWh or even R85/kWh (if a study by the CSIR is anything to go by), the cost to the economy in 2022 would be more like R590-billion or R1-trillion respectively.</span>\r\n<h4><b>Rising OCGT usage</b></h4>\r\n<span style=\"font-weight: 400;\">The worst-case scenarios began to rear their head when Eskom was forced to implement Stage 6 load shedding on 11 January 2023 after 11 generation units unexpectedly broke down, taking the total amount of generation capacity offline to more than half of its installed capacity of about 46,000MW.</span>\r\n\r\n<span style=\"font-weight: 400;\">The load factor for Eskom’s OCGTs shot up to 48% at that time — meaning they were running flat out for about 12 hours of the day — and this is what enabled South Africa to avert crippling Stage 8 load shedding for the first time.</span>\r\n\r\n<span style=\"font-weight: 400;\">There are growing suggestions within the African National Congress that Eskom is deliberately implementing load shedding to scupper the ruling party’s chances in the 2024 national election. This is reinforced by utterances from minerals and energy minister Gwede Mantashe, who has claimed that Eskom is allowing more than 20,000MW of installed generation capacity to “stand idle”.</span>\r\n\r\n<span style=\"font-weight: 400;\">In reality, Eskom’s system operator implements load shedding to balance supply and demand on the grid, to avert a national blackout. The risk of this catastrophe is still seen as slim — provided that Eskom has enough diesel for the OCGTs, as well as other emergency levers at the disposal of the system operator.</span>\r\n\r\n<span style=\"font-weight: 400;\">Eskom’s own OCGT power plants — Ankerlig and Gourikwa — can generate up to 2,067MW of power, which mitigates two stages of load shedding. There are also two further OCGT power plants — Dedisa and Avon — owned and operated by independent power producers (IPPs), which can generate 1,005MW to avert a further one stage of load shedding. The IPP OCGTs are not part of Eskom’s diesel headache as they buy their own fuel.</span>\r\n\r\n<span style=\"font-weight: 400;\">A look at the load factor trend for Eskom’s OCGT usage over the past year tells the whole story. In financial year 2021/2022 it averaged 7%, and in the year to date it stands at 14%, according to Cassim. This compares with an OCGT usage load factor of just 6% factored into Eskom’s latest electricity tariff approved by Nersa for the 2023/24 financial year starting 1 April 2023.</span>\r\n<h4><b>The diesel outlook</b></h4>\r\n<span style=\"font-weight: 400;\">Now, once again, Eskom is peering into an abyss. Its second batch of diesel is expected to run out at the end of January 2023, and the Eskom board is looking at ways of coming up with the cash to keep the OCGTs running until the start of the new financial year on 1 April 2023. </span>\r\n\r\n<span style=\"font-weight: 400;\">“We now need to find cash somewhere, and as soon as possible. We have been given some actions that we are actively and urgently pursuing to see how we can obtain money to deal with this challenge of not being able to run the OCGTs”, Oberholzer said. </span>\r\n\r\n<span style=\"font-weight: 400;\">But none of the options on the table look like quick fixes. One option would be to receive some of the arrear debt of more than R50-billion which Eskom is currently owed by municipalities. Another would be the receipt of a hefty diesel tax rebate claimed from the South African Revenue Service (SARS), which Eskom’s financials show as just over R3-billion for the year ending 31 March 2022.</span>\r\n\r\n<span style=\"font-weight: 400;\">In terms of an amendment to Section 75 of the Customs and Excise Act, from 3 August 2022 Eskom is allowed Fuel and Road Accident Fund levy rebates totalling R4.04/litre of diesel used for power generation. From estimates of diesel fuel burned in Eskom’s OCGTs, this R3-billion could therefore easily have risen very substantially.</span>\r\n\r\n<span style=\"font-weight: 400;\">However, the diesel fuel rebates anticipated by Eskom have been disputed by SARS for more than a year, and the clock is ticking. </span>\r\n\r\n<span style=\"font-weight: 400;\">Oberholzer maintains that Eskom has no problems in sourcing diesel, although it is largely all imported, and South Africa has no official strategic reserves. </span><span style=\"font-weight: 400;\">\r\n</span><span style=\"font-weight: 400;\">The country as a whole uses between 12- to 14-billion litres of diesel a year, and at a load factor of 15%, the diesel used by the OCGTs operated by both Eskom and the IPPs would amount to about 1.13-billion litres — less than 10% of the total. </span><b>DM</b>\r\n\r\n<i><span style=\"font-weight: 400;\">Mariam Isa, independent journalist, and Chris Yelland, EE Business Intelligence.</span></i>\r\n\r\n<i><span style=\"font-weight: 400;\">© Copyright 2023 — EE Business Intelligence (Pty) Ltd. All rights reserved. This article may not be published without the written permission of EE Business Intelligence.</span></i>",
"focal": "50% 50%",
"width": 0,
"height": 0,
"url": "https://dmcdn.whitebeard.net/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg",
"transforms": [
{
"x": "200",
"y": "100",
"url": "https://dmcdn.whitebeard.net/i/BgTPv5lUAwaaWVN_U8jPObB-xLE=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg"
},
{
"x": "450",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/-Gid52meWOHbWllbzoUBOSw09-g=/450x0/smart/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg"
},
{
"x": "800",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/S6lH7wZ_fW9RZBG2dCL94CVuyhI=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg"
},
{
"x": "1200",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/KaaEKaJ6LeDFJvNJk73Br4Z8_Xo=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg"
},
{
"x": "1600",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/enNBP6PmE3-ir_8ZFa5WeHnwidA=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg"
}
],
"url_thumbnail": "https://dmcdn.whitebeard.net/i/BgTPv5lUAwaaWVN_U8jPObB-xLE=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg",
"url_medium": "https://dmcdn.whitebeard.net/i/-Gid52meWOHbWllbzoUBOSw09-g=/450x0/smart/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg",
"url_large": "https://dmcdn.whitebeard.net/i/S6lH7wZ_fW9RZBG2dCL94CVuyhI=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg",
"url_xl": "https://dmcdn.whitebeard.net/i/KaaEKaJ6LeDFJvNJk73Br4Z8_Xo=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg",
"url_xxl": "https://dmcdn.whitebeard.net/i/enNBP6PmE3-ir_8ZFa5WeHnwidA=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2023/01/IsaYelland-SA-power-lifeline-frays-2.jpg",
"type": "image"
}
],
"summary": "Eskom is struggling in its efforts to obtain the diesel needed to continue running its open-cycle gas turbines which, in the face of prolonged power generation outages, is the only way the utility can stave off severe and ongoing curtailment of South Africa’s electricity supply.",
"template_type": null,
"dm_custom_section_label": null,
"elements": [],
"seo": {
"search_title": "Hand-to-Mouth: South Africa’s power lifeline frays as Eskom scrambles for diesel",
"search_description": "<span style=\"font-weight: 400;\">In the past two years, Eskom has been forced to rely increasingly on the open-cycle gas turbines (OCGTs) — which were intended only for dire emergencies or use during p",
"social_title": "Hand-to-Mouth: South Africa’s power lifeline frays as Eskom scrambles for diesel",
"social_description": "<span style=\"font-weight: 400;\">In the past two years, Eskom has been forced to rely increasingly on the open-cycle gas turbines (OCGTs) — which were intended only for dire emergencies or use during p",
"social_image": ""
},
"cached": true,
"access_allowed": true
}