All Article Properties:
{
"access_control": false,
"status": "publish",
"objectType": "Article",
"id": "1124400",
"signature": "Article:1124400",
"url": "https://staging.dailymaverick.co.za/article/2021-12-12-keeping-the-lights-on-a-culture-of-maintenance-is-sorely-needed-by-the-custodians-of-public-assets/",
"shorturl": "https://staging.dailymaverick.co.za/article/1124400",
"slug": "keeping-the-lights-on-a-culture-of-maintenance-is-sorely-needed-by-the-custodians-of-public-assets",
"contentType": {
"id": "1",
"name": "Article",
"slug": "article"
},
"views": 0,
"comments": 3,
"preview_limit": null,
"excludedFromGoogleSearchEngine": 0,
"title": "Keeping the lights on: A culture of maintenance is sorely needed by the custodians of public assets",
"firstPublished": "2021-12-12 18:43:34",
"lastUpdate": "2021-12-12 18:43:34",
"categories": [
{
"id": "29",
"name": "South Africa",
"signature": "Category:29",
"slug": "south-africa",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/south-africa/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "Daily Maverick is an independent online news publication and weekly print newspaper in South Africa.\r\n\r\nIt is known for breaking some of the defining stories of South Africa in the past decade, including the Marikana Massacre, in which the South African Police Service killed 34 miners in August 2012.\r\n\r\nIt also investigated the Gupta Leaks, which won the 2019 Global Shining Light Award.\r\n\r\nThat investigation was credited with exposing the Indian-born Gupta family and former President Jacob Zuma for their role in the systemic political corruption referred to as state capture.\r\n\r\nIn 2018, co-founder and editor-in-chief Branislav ‘Branko’ Brkic was awarded the country’s prestigious Nat Nakasa Award, recognised for initiating the investigative collaboration after receiving the hard drive that included the email tranche.\r\n\r\nIn 2021, co-founder and CEO Styli Charalambous also received the award.\r\n\r\nDaily Maverick covers the latest political and news developments in South Africa with breaking news updates, analysis, opinions and more.",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
},
{
"id": "178318",
"name": "Our Burning Planet",
"signature": "Category:178318",
"slug": "our-burning-planet",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/our-burning-planet/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
}
],
"content_length": 8089,
"contents": "<span style=\"font-weight: 400;\">At the beginning of November, South Africa signed a landmark R130-billion deal with developed countries to support the country’s transition towards a low-carbon and climate-resilient economy.</span>\r\n\r\n<span style=\"font-weight: 400;\">While this is a critical and important step towards achieving a just transition to clean energy, as well as balancing the country’s energy mix, the immediate and urgent objective remains to keep the lights on in South Africa. To do this, utilities must work to ensure that their current energy infrastructure is secured and properly maintained throughout the plant lifetime.</span>\r\n\r\n<span style=\"font-weight: 400;\">Coal-fired energy still accounts for 83% of the country’s energy mix. Of Eskom’s 15 coal-fired power stations, 13 are at an average age of 42 years, with some needing to be decommissioned in the next few years. Old plants are unreliable and unpredictable and their performance is extremely poor. Nonetheless, they are critical to our ability to generate power and fuel the economy during the transition, so we need to urgently look at how to successfully maintain these key resources.</span>\r\n\r\n<span style=\"font-weight: 400;\">In order to explore the critical and ongoing role of reliability maintenance in energy generation, EE Business Intelligence invited key stakeholders </span><b>—</b><span style=\"font-weight: 400;\"> including Jan Oberholzer, COO of Eskom </span><b>—</b><span style=\"font-weight: 400;\"> and other experts in this space to a webinar to explore the challenges and solutions to the generation maintenance issues confronting Eskom and South Africa.</span>\r\n\r\n<p><a href=\"https://www.dailymaverick.co.za/eskom-holdings-soc-ltd-s-tutuka-coal-fired-power-plant-5/\"><img loading=\"lazy\" class=\"size-full wp-image-1124449\" src=\"https://www.dailymaverick.co.za/wp-content/uploads/2021/12/chris-maintainpubassests-option-5.jpg\" alt=\"public assets maintenance eskom power stations\" width=\"720\" height=\"360\" /></a> Workers carry out maintenance on coal silos at Eskom’s Tutuka coal-fired power station in Mpumalanga. (Photo: Waldo Swiegers / Bloomberg via Getty Images)</p>\r\n\r\n<span style=\"font-weight: 400;\">Other participants, besides Eskom, included Sasol, the Electric Power Research Institute (EPRI), a global non-profit that conducts research and provides global best practice in respect of electricity generation, energy economist Lungile Mashele, and original equipment manufacturers (OEM) like Babcock Ntuthuko Engineering and ACTOM John Thompson Boilers.</span>\r\n\r\n<span style=\"font-weight: 400;\">While Eskom requires maintenance across its plants and equipment, </span><a href=\"https://www.atlantic.co.za/maint1.html\"><span style=\"font-weight: 400;\">the webinar discussion</span></a><span style=\"font-weight: 400;\"> focused on boiler tube failures, which are a major cause of downtime, outages and indeed load shedding. These failures are responsible for 2% of Eskom’s unplanned capability loss factor (UCLF). While 2% may sound small, it is in fact equal to two stages of load shedding. So, getting the maintenance and reliability of Eskom’s boilers right is critical.</span>\r\n\r\n<span style=\"font-weight: 400;\">So, how best to do this?</span>\r\n\r\n<b>Focus on proper planning and work smart</b>\r\n\r\n<span style=\"font-weight: 400;\">Global best practice, according to EPRI, shows us that successfully maintaining a plant requires diligent focus and commitment to proper philosophy maintenance to address breakdowns when they occur, and prevent downtime risks by understanding the exact status of generation plants at all times, allowing the utility to predict where issues will arise in the future. This requires a combination of the right skills, availability of finances and proper planning.</span>\r\n\r\n<span style=\"font-weight: 400;\">The overall sentiment from experts was that if you do the right thing over a long period of time, you will get the right outcome. Sasol provided an excellent case study on maintenance of boiler tubes at its own boiler plants, using a smart maintenance platform which is driven and underpinned by solid real-time equipment monitoring data. Sasol’s Rightwell Laxa said we often overestimate what can be achieved in one year, while underestimating what can be achieved, through dogged perseverance and a data-driven approach, over three years.</span>\r\n\r\n<span style=\"font-weight: 400;\">Babcock Nthuthuko Engineering, the South African subsidiary of Babcock International, one of the world’s largest engineering, aerospace, defence and energy firms, was represented on the panel by Thava Govender. He believes that strong, long-term philosophy maintenance partnerships with utilities produces the best results as it allows for long-term planning, decisions and strategies that are rooted in evidence and data. These partnerships are based on long-term contracts that include incentive and penalty clauses that allow utilities to hold maintenance service providers to account for timeous and efficient delivery.</span>\r\n\r\n<b>Unlock the money needed and use the right skills</b>\r\n\r\n<span style=\"font-weight: 400;\">An ideal reliability maintenance programme requires critical elements to be in place before it can be implemented. In short: finance, skills and spares. The experts emphasised that this is likely to take up to 24 months of planning, and should include available and dedicated funds in the bank, not just in the budget. One of the key headwinds facing Eskom is the lack of financial stability. Oberholzer said Eskom needed R11-billion a year to properly invest in a philosophy maintenance programme. </span>\r\n\r\n<span style=\"font-weight: 400;\">Energy economist Mashele said Eskom struggles to meet the threshold to receive affordable and sufficient funding from external lenders. Lenders have their own technical teams that look at a number of factors. The usual factors include commercial, financial and ESG (environmental, social and governance) requirements In addition, there are technical teams that look at maintenance spend and annual maintenance plans, energy availability factor (EAF), energy utilisation factor (EUF), capacity factor at a plant level, workforce including skills, unplanned capability loss factor (UCLF), planned capability loss factor (PCLF), the average age of the fleet and when units will be decommissioned, and the utility’s energy transition plans. Mashele said constant uncertainty about tariff increases and the ongoing decline in plant performance is unhelpful for lenders.</span>\r\n\r\n<span style=\"font-weight: 400;\">Mashele has been tracking Eskom’s maintenance programme spend for the past decade and believes it has been worryingly erratic since 2016, sending funders a red flag in respect of reliability. This year’s load shedding has been the worst yet and Mashele believes this is a direct result of low spending on maintenance over the course of a number of years.</span>\r\n\r\n<span style=\"font-weight: 400;\">Eskom set itself a target of one boiler tube failure per unit a year, but it is currently at 2.3 a year, and nothing is stopping this from escalating to as much as three by the end of the year.</span>\r\n\r\n<span style=\"font-weight: 400;\">Mashele said this is because the maintenance programme is ill defined, which is extremely concerning to funders who need greater clarity and certainty when it comes to maintenance investment. She also mentioned the importance of honing and retaining proper skills at the utility and believes it is important that Eskom develop solid partnerships with OEMs.</span>\r\n\r\n<span style=\"font-weight: 400;\">A key factor for a successful maintenance plan, including emergency, preventive and predictive measures, is to ensure that the right people with deep experience, expertise and knowledge of the plant systems are brought on board.</span>\r\n\r\n<p><a href=\"https://www.dailymaverick.co.za/eskom-holdings-soc-ltd-s-tutuka-coal-fired-power-plant-4/\"><img loading=\"lazy\" class=\"size-full wp-image-1124448\" src=\"https://www.dailymaverick.co.za/wp-content/uploads/2021/12/chris-maintainpubassests-option-4.jpg\" alt=\"\" width=\"720\" height=\"378\" /></a> Workers pass coal storage silos at the Eskom Holdings SOC Ltd. Tutuka coal-fired power station in Mpumalanga, South Africa, on Thursday, Nov. 18, 2021. (Photo: Waldo Swiegers/Bloomberg via Getty Images)</p>\r\n\r\n<span style=\"font-weight: 400;\">Oberholzer conceded that Eskom had lost critical skills over the course of the past few years, but said it was prioritising funding, developing and retaining the technical and leadership skills required. Getting these skills into the utility, whether directly or through competent OEM partners, is essential if the maintenance programme is to work.</span>\r\n\r\n<span style=\"font-weight: 400;\">In their presentations, every speaker highlighted the importance of power plant operators partnering with OEMs. Oberholzer likened this to servicing a vehicle. If your Mercedes Benz breaks down, you’re going to be in trouble if you take it to a mechanic that has no knowledge of the car, or who will replace the parts with inferior parts, especially if they are not specifically designed for that vehicle. </span>\r\n\r\n<span style=\"font-weight: 400;\">What is clear is that Eskom needs to stick to a well-defined and ongoing philosophy maintenance plan, come what may. This will only happen when all parties, including government, the utility, private sector energy providers and OEMs pool their resources, expertise, experience, technology, innovation and skills. This will help save Eskom, and the country. </span><b>DM</b>\r\n\r\n<i><span style=\"font-weight: 400;\"> Chris Yelland is managing director of EE Business Intelligence.</span></i>\r\n\r\n<i><span style=\"font-weight: 400;\">[hearken id=\"daily-maverick/8881\"]</span></i>",
"teaser": "Keeping the lights on: A culture of maintenance is sorely needed by the custodians of public assets",
"externalUrl": "",
"sponsor": null,
"authors": [
{
"id": "141",
"name": "Chris Yelland",
"image": "https://www.dailymaverick.co.za/wp-content/uploads/chris-yelland-column-photo.jpg",
"url": "https://staging.dailymaverick.co.za/author/chrisyelland/",
"editorialName": "chrisyelland",
"department": "",
"name_latin": ""
}
],
"description": "",
"keywords": [
{
"type": "Keyword",
"data": {
"keywordId": "2741",
"name": "Eskom",
"url": "https://staging.dailymaverick.co.za/keyword/eskom/",
"slug": "eskom",
"description": "Eskom is the primary electricity supplier and generator of power in South Africa. It is a state-owned enterprise that was established in 1923 as the Electricity Supply Commission (ESCOM) and later changed its name to Eskom. The company is responsible for generating, transmitting, and distributing electricity to the entire country, and it is one of the largest electricity utilities in the world, supplying about 90% of the country's electricity needs. It generates roughly 30% of the electricity used\r\nin Africa.\r\n\r\nEskom operates a variety of power stations, including coal-fired, nuclear, hydro, and renewable energy sources, and has a total installed capacity of approximately 46,000 megawatts. The company is also responsible for maintaining the electricity grid infrastructure, which includes power lines and substations that distribute electricity to consumers.\r\n\r\nEskom plays a critical role in the South African economy, providing electricity to households, businesses, and industries, and supporting economic growth and development. However, the company has faced several challenges in recent years, including financial difficulties, aging infrastructure, and operational inefficiencies, which have led to power outages and load shedding in the country.\r\n\r\nDaily Maverick has reported on this extensively, including its recently published investigations from the Eskom Intelligence Files which demonstrated extensive sabotage at the power utility. Intelligence reports obtained by Daily Maverick linked two unnamed senior members of President Cyril Ramaphosa’s Cabinet to four criminal cartels operating inside Eskom. The intelligence links the cartels to the sabotage of Eskom’s power stations and to a programme of political destabilisation which has contributed to the current power crisis.",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Eskom",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "115684",
"name": "coal-fired power stations",
"url": "https://staging.dailymaverick.co.za/keyword/coalfired-power-stations/",
"slug": "coalfired-power-stations",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "coal-fired power stations",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "166246",
"name": "energy availability factor",
"url": "https://staging.dailymaverick.co.za/keyword/energy-availability-factor/",
"slug": "energy-availability-factor",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "energy availability factor",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "177614",
"name": "Jan Oberholzer",
"url": "https://staging.dailymaverick.co.za/keyword/jan-oberholzer/",
"slug": "jan-oberholzer",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Jan Oberholzer",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "364010",
"name": "Lungile Mashele",
"url": "https://staging.dailymaverick.co.za/keyword/lungile-mashele/",
"slug": "lungile-mashele",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Lungile Mashele",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "364011",
"name": "Babcock Ntuthuko Engineering",
"url": "https://staging.dailymaverick.co.za/keyword/babcock-ntuthuko-engineering/",
"slug": "babcock-ntuthuko-engineering",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Babcock Ntuthuko Engineering",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "364012",
"name": "OEMs",
"url": "https://staging.dailymaverick.co.za/keyword/oems/",
"slug": "oems",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "OEMs",
"translations": null
}
}
],
"short_summary": null,
"source": null,
"related": [],
"options": [],
"attachments": [
{
"id": "44594",
"name": "Workers pass coal storage silos at the Eskom Holdings SOC Ltd. Tutuka coal-fired power station in Mpumalanga, South Africa, on Thursday, Nov. 18, 2021. (Photo: Waldo Swiegers/Bloomberg via Getty Images)",
"description": "<span style=\"font-weight: 400;\">At the beginning of November, South Africa signed a landmark R130-billion deal with developed countries to support the country’s transition towards a low-carbon and climate-resilient economy.</span>\r\n\r\n<span style=\"font-weight: 400;\">While this is a critical and important step towards achieving a just transition to clean energy, as well as balancing the country’s energy mix, the immediate and urgent objective remains to keep the lights on in South Africa. To do this, utilities must work to ensure that their current energy infrastructure is secured and properly maintained throughout the plant lifetime.</span>\r\n\r\n<span style=\"font-weight: 400;\">Coal-fired energy still accounts for 83% of the country’s energy mix. Of Eskom’s 15 coal-fired power stations, 13 are at an average age of 42 years, with some needing to be decommissioned in the next few years. Old plants are unreliable and unpredictable and their performance is extremely poor. Nonetheless, they are critical to our ability to generate power and fuel the economy during the transition, so we need to urgently look at how to successfully maintain these key resources.</span>\r\n\r\n<span style=\"font-weight: 400;\">In order to explore the critical and ongoing role of reliability maintenance in energy generation, EE Business Intelligence invited key stakeholders </span><b>—</b><span style=\"font-weight: 400;\"> including Jan Oberholzer, COO of Eskom </span><b>—</b><span style=\"font-weight: 400;\"> and other experts in this space to a webinar to explore the challenges and solutions to the generation maintenance issues confronting Eskom and South Africa.</span>\r\n\r\n[caption id=\"attachment_1124449\" align=\"alignnone\" width=\"720\"]<a href=\"https://www.dailymaverick.co.za/eskom-holdings-soc-ltd-s-tutuka-coal-fired-power-plant-5/\"><img class=\"size-full wp-image-1124449\" src=\"https://www.dailymaverick.co.za/wp-content/uploads/2021/12/chris-maintainpubassests-option-5.jpg\" alt=\"public assets maintenance eskom power stations\" width=\"720\" height=\"360\" /></a> Workers carry out maintenance on coal silos at Eskom’s Tutuka coal-fired power station in Mpumalanga. (Photo: Waldo Swiegers / Bloomberg via Getty Images)[/caption]\r\n\r\n<span style=\"font-weight: 400;\">Other participants, besides Eskom, included Sasol, the Electric Power Research Institute (EPRI), a global non-profit that conducts research and provides global best practice in respect of electricity generation, energy economist Lungile Mashele, and original equipment manufacturers (OEM) like Babcock Ntuthuko Engineering and ACTOM John Thompson Boilers.</span>\r\n\r\n<span style=\"font-weight: 400;\">While Eskom requires maintenance across its plants and equipment, </span><a href=\"https://www.atlantic.co.za/maint1.html\"><span style=\"font-weight: 400;\">the webinar discussion</span></a><span style=\"font-weight: 400;\"> focused on boiler tube failures, which are a major cause of downtime, outages and indeed load shedding. These failures are responsible for 2% of Eskom’s unplanned capability loss factor (UCLF). While 2% may sound small, it is in fact equal to two stages of load shedding. So, getting the maintenance and reliability of Eskom’s boilers right is critical.</span>\r\n\r\n<span style=\"font-weight: 400;\">So, how best to do this?</span>\r\n\r\n<b>Focus on proper planning and work smart</b>\r\n\r\n<span style=\"font-weight: 400;\">Global best practice, according to EPRI, shows us that successfully maintaining a plant requires diligent focus and commitment to proper philosophy maintenance to address breakdowns when they occur, and prevent downtime risks by understanding the exact status of generation plants at all times, allowing the utility to predict where issues will arise in the future. This requires a combination of the right skills, availability of finances and proper planning.</span>\r\n\r\n<span style=\"font-weight: 400;\">The overall sentiment from experts was that if you do the right thing over a long period of time, you will get the right outcome. Sasol provided an excellent case study on maintenance of boiler tubes at its own boiler plants, using a smart maintenance platform which is driven and underpinned by solid real-time equipment monitoring data. Sasol’s Rightwell Laxa said we often overestimate what can be achieved in one year, while underestimating what can be achieved, through dogged perseverance and a data-driven approach, over three years.</span>\r\n\r\n<span style=\"font-weight: 400;\">Babcock Nthuthuko Engineering, the South African subsidiary of Babcock International, one of the world’s largest engineering, aerospace, defence and energy firms, was represented on the panel by Thava Govender. He believes that strong, long-term philosophy maintenance partnerships with utilities produces the best results as it allows for long-term planning, decisions and strategies that are rooted in evidence and data. These partnerships are based on long-term contracts that include incentive and penalty clauses that allow utilities to hold maintenance service providers to account for timeous and efficient delivery.</span>\r\n\r\n<b>Unlock the money needed and use the right skills</b>\r\n\r\n<span style=\"font-weight: 400;\">An ideal reliability maintenance programme requires critical elements to be in place before it can be implemented. In short: finance, skills and spares. The experts emphasised that this is likely to take up to 24 months of planning, and should include available and dedicated funds in the bank, not just in the budget. One of the key headwinds facing Eskom is the lack of financial stability. Oberholzer said Eskom needed R11-billion a year to properly invest in a philosophy maintenance programme. </span>\r\n\r\n<span style=\"font-weight: 400;\">Energy economist Mashele said Eskom struggles to meet the threshold to receive affordable and sufficient funding from external lenders. Lenders have their own technical teams that look at a number of factors. The usual factors include commercial, financial and ESG (environmental, social and governance) requirements In addition, there are technical teams that look at maintenance spend and annual maintenance plans, energy availability factor (EAF), energy utilisation factor (EUF), capacity factor at a plant level, workforce including skills, unplanned capability loss factor (UCLF), planned capability loss factor (PCLF), the average age of the fleet and when units will be decommissioned, and the utility’s energy transition plans. Mashele said constant uncertainty about tariff increases and the ongoing decline in plant performance is unhelpful for lenders.</span>\r\n\r\n<span style=\"font-weight: 400;\">Mashele has been tracking Eskom’s maintenance programme spend for the past decade and believes it has been worryingly erratic since 2016, sending funders a red flag in respect of reliability. This year’s load shedding has been the worst yet and Mashele believes this is a direct result of low spending on maintenance over the course of a number of years.</span>\r\n\r\n<span style=\"font-weight: 400;\">Eskom set itself a target of one boiler tube failure per unit a year, but it is currently at 2.3 a year, and nothing is stopping this from escalating to as much as three by the end of the year.</span>\r\n\r\n<span style=\"font-weight: 400;\">Mashele said this is because the maintenance programme is ill defined, which is extremely concerning to funders who need greater clarity and certainty when it comes to maintenance investment. She also mentioned the importance of honing and retaining proper skills at the utility and believes it is important that Eskom develop solid partnerships with OEMs.</span>\r\n\r\n<span style=\"font-weight: 400;\">A key factor for a successful maintenance plan, including emergency, preventive and predictive measures, is to ensure that the right people with deep experience, expertise and knowledge of the plant systems are brought on board.</span>\r\n\r\n[caption id=\"attachment_1124448\" align=\"alignnone\" width=\"720\"]<a href=\"https://www.dailymaverick.co.za/eskom-holdings-soc-ltd-s-tutuka-coal-fired-power-plant-4/\"><img class=\"size-full wp-image-1124448\" src=\"https://www.dailymaverick.co.za/wp-content/uploads/2021/12/chris-maintainpubassests-option-4.jpg\" alt=\"\" width=\"720\" height=\"378\" /></a> Workers pass coal storage silos at the Eskom Holdings SOC Ltd. Tutuka coal-fired power station in Mpumalanga, South Africa, on Thursday, Nov. 18, 2021. (Photo: Waldo Swiegers/Bloomberg via Getty Images)[/caption]\r\n\r\n<span style=\"font-weight: 400;\">Oberholzer conceded that Eskom had lost critical skills over the course of the past few years, but said it was prioritising funding, developing and retaining the technical and leadership skills required. Getting these skills into the utility, whether directly or through competent OEM partners, is essential if the maintenance programme is to work.</span>\r\n\r\n<span style=\"font-weight: 400;\">In their presentations, every speaker highlighted the importance of power plant operators partnering with OEMs. Oberholzer likened this to servicing a vehicle. If your Mercedes Benz breaks down, you’re going to be in trouble if you take it to a mechanic that has no knowledge of the car, or who will replace the parts with inferior parts, especially if they are not specifically designed for that vehicle. </span>\r\n\r\n<span style=\"font-weight: 400;\">What is clear is that Eskom needs to stick to a well-defined and ongoing philosophy maintenance plan, come what may. This will only happen when all parties, including government, the utility, private sector energy providers and OEMs pool their resources, expertise, experience, technology, innovation and skills. This will help save Eskom, and the country. </span><b>DM</b>\r\n\r\n<i><span style=\"font-weight: 400;\"> Chris Yelland is managing director of EE Business Intelligence.</span></i>\r\n\r\n<i><span style=\"font-weight: 400;\">[hearken id=\"daily-maverick/8881\"]</span></i>",
"focal": "50% 50%",
"width": 0,
"height": 0,
"url": "https://dmcdn.whitebeard.net/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg",
"transforms": [
{
"x": "200",
"y": "100",
"url": "https://dmcdn.whitebeard.net/i/92bu_gEzWHgcMdg4k1XjtguWKJc=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg"
},
{
"x": "450",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/DSu3Rjh821xyIPAC5SePFg30GXU=/450x0/smart/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg"
},
{
"x": "800",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/IWDMILifxeBxpCI1fSBDLqWrDzc=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg"
},
{
"x": "1200",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/UPKSYaCRvjqO8bnG8z9HPCQ_z5I=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg"
},
{
"x": "1600",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/JUAxqG5YFwGHOyzkcYR5uUaRZl8=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg"
}
],
"url_thumbnail": "https://dmcdn.whitebeard.net/i/92bu_gEzWHgcMdg4k1XjtguWKJc=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg",
"url_medium": "https://dmcdn.whitebeard.net/i/DSu3Rjh821xyIPAC5SePFg30GXU=/450x0/smart/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg",
"url_large": "https://dmcdn.whitebeard.net/i/IWDMILifxeBxpCI1fSBDLqWrDzc=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg",
"url_xl": "https://dmcdn.whitebeard.net/i/UPKSYaCRvjqO8bnG8z9HPCQ_z5I=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg",
"url_xxl": "https://dmcdn.whitebeard.net/i/JUAxqG5YFwGHOyzkcYR5uUaRZl8=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/12/chris-maintainpubassests-option-1.jpg",
"type": "image"
}
],
"summary": "Even as South Africa transitions to a low-carbon future, whatever the technologies employed, a culture of proper reliability maintenance of all plants — including coal-fired power stations, boilers and associated power generation equipment — is needed throughout the plant life cycle.",
"template_type": null,
"dm_custom_section_label": null,
"elements": [],
"seo": {
"search_title": "Keeping the lights on: A culture of maintenance is sorely needed by the custodians of public assets",
"search_description": "<span style=\"font-weight: 400;\">At the beginning of November, South Africa signed a landmark R130-billion deal with developed countries to support the country’s transition towards a low-carbon and cli",
"social_title": "Keeping the lights on: A culture of maintenance is sorely needed by the custodians of public assets",
"social_description": "<span style=\"font-weight: 400;\">At the beginning of November, South Africa signed a landmark R130-billion deal with developed countries to support the country’s transition towards a low-carbon and cli",
"social_image": ""
},
"cached": true,
"access_allowed": true
}