All Article Properties:
{
"access_control": false,
"status": "publish",
"objectType": "Article",
"id": "1007985",
"signature": "Article:1007985",
"url": "https://staging.dailymaverick.co.za/article/2021-08-12-medupi-explosion-sabotage-ruled-out-but-the-r2bn-repair-price-could-fall-on-energy-customers/",
"shorturl": "https://staging.dailymaverick.co.za/article/1007985",
"slug": "medupi-explosion-sabotage-ruled-out-but-the-r2bn-repair-price-could-fall-on-energy-customers",
"contentType": {
"id": "1",
"name": "Article",
"slug": "article"
},
"views": 0,
"comments": 21,
"preview_limit": null,
"excludedFromGoogleSearchEngine": 0,
"title": "Medupi explosion: Sabotage ruled out, but the R2bn repair price could fall on energy customers",
"firstPublished": "2021-08-12 22:04:23",
"lastUpdate": "2021-08-13 06:24:19",
"categories": [
{
"id": "9",
"name": "Business Maverick",
"signature": "Category:9",
"slug": "business-maverick",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/business-maverick/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
},
{
"id": "29",
"name": "South Africa",
"signature": "Category:29",
"slug": "south-africa",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/south-africa/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "Daily Maverick is an independent online news publication and weekly print newspaper in South Africa.\r\n\r\nIt is known for breaking some of the defining stories of South Africa in the past decade, including the Marikana Massacre, in which the South African Police Service killed 34 miners in August 2012.\r\n\r\nIt also investigated the Gupta Leaks, which won the 2019 Global Shining Light Award.\r\n\r\nThat investigation was credited with exposing the Indian-born Gupta family and former President Jacob Zuma for their role in the systemic political corruption referred to as state capture.\r\n\r\nIn 2018, co-founder and editor-in-chief Branislav ‘Branko’ Brkic was awarded the country’s prestigious Nat Nakasa Award, recognised for initiating the investigative collaboration after receiving the hard drive that included the email tranche.\r\n\r\nIn 2021, co-founder and CEO Styli Charalambous also received the award.\r\n\r\nDaily Maverick covers the latest political and news developments in South Africa with breaking news updates, analysis, opinions and more.",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
}
],
"content_length": 4434,
"contents": "<span style=\"font-weight: 400;\">How big a setback is the recent explosion at a unit of Medupi Power Station for SA’s energy security that has long been compromised?</span>\r\n\r\n<span style=\"font-weight: 400;\">It will be an enormous setback, considering that the explosion has cost SA 700 megawatts in lost energy generating capacity at Medupi in Lephalale, Limpopo, which has become the most expensive coal-fired power station in the world to construct, with an estimated capital cost of at least R120-billion (so far).</span>\r\n\r\n<span style=\"font-weight: 400;\">For context, the Eastern Cape is the least energy-guzzling province in SA because it doesn’t have energy-intensive industries that SA’s economy relies on, unlike North West, which is a mecca for the mining industry, requiring more energy from Eskom.</span>\r\n\r\n<span style=\"font-weight: 400;\">To power up the Eastern Cape, the province requires at least 2,000MW every day from Eskom. The lost generation capacity at the Medupi unit (700MW) represents about a third of the Eastern Cape’s daily energy needs.</span>\r\n\r\n<span style=\"font-weight: 400;\">To recap: Before midnight on Sunday, 8 August, the Medupi Power Station experienced an explosion at the Unit 4 generator, resulting in extensive damages to the unit. The cause of the explosion is not yet known and an investigation into how the blast occurred is under way.</span>\r\n\r\n<span style=\"font-weight: 400;\">Unit 4 has been shut down and the entire 700MW that it produces is gone. It will return once the unit has been completely fixed. The damage might have been worse because the explosion could have also damaged Unit 5, which, in design, is in proximity to the now-gutted Unit 4. </span>\r\n\r\n<span style=\"font-weight: 400;\">Eskom spokesperson Sikonathi Mantshantsha told</span><i><span style=\"font-weight: 400;\"> Business Maverick</span></i><span style=\"font-weight: 400;\"> that mechanical safety devices at Unit 5 kicked in to prevent major damage at the unit. There was minor damage to the unit and by Wednesday evening, the unit “returned to service”.</span>\r\n\r\n<span style=\"font-weight: 400;\">Eskom CEO </span><a href=\"https://www.news24.com/fin24/economy/eskom/medupi-blast-repairs-could-cost-up-to-r2-billion-and-take-two-years-de-ruyter-says-20210812\"><span style=\"font-weight: 400;\">André de Ruyter told </span><i><span style=\"font-weight: 400;\">News24</span></i></a><span style=\"font-weight: 400;\"> that repairing the damage at Unit 4 could cost between R1.5-billion and R2-billion, and could take up to two years.</span>\r\n\r\n<span style=\"font-weight: 400;\">But estimates of the cost and duration of fixing the unit are premature as an investigation into how the blast occurred is at an early stage. </span><span style=\"font-weight: 400;\">In other words, the cost of the repairs could actually be more than R2-billion once the investigation is completed. </span>\r\n\r\n<span style=\"font-weight: 400;\">“We said we don’t know the extent of the damage, how long, and how much it will take to repair. We don’t have the final answers yet,” said Mantshantsha.</span>\r\n\r\n<span style=\"font-weight: 400;\">Mantshantsha’s boss, De Ruyter, has already ruled out sabotage as the cause of the explosion. “We, however, don’t suspect any foul play or sabotage. The loss of approximately 700MW is a blow to our efforts to maintain a stable electricity supply,” De Ruyter said.</span>\r\n\r\n<span style=\"font-weight: 400;\">After all, the explosion happened a few days after Eskom announced that the construction of Medupi had been completed. At 4,764MW, the energy-generating capacity of Medupi could power up the requirements of the Western Cape, which requires 3,500MW a day.</span>\r\n\r\n<span style=\"font-weight: 400;\">Completion of Medupi was announced after Unit 1, the last of six generation units of Medupi, attained commercial operation status. The capital cost of Medupi has been R122-billion so far, and Eskom estimates that it could reach R135-billion on full competition over the next 24 months. It was initially meant to cost between R56-billion and R80-billion. The power station came online seven years after the scheduled date of completion of 2014.</span>\r\n\r\n<span style=\"font-weight: 400;\">The completion of Medupi Power Station doesn’t necessarily mean the end of load shedding. In fact, the explosion might exacerbate the need for routine power cuts. Before the explosion, Medupi assumed an energy availability factor (EAF) – the percentage of Eskom’s power available for dispatch – of 63.3% for the five units, excluding Unit 1.</span>\r\n\r\n<span style=\"font-weight: 400;\">Mantshantsha said the EAF might have been reduced due to the explosion. </span>\r\n\r\n<span style=\"font-weight: 400;\">“It is premature to pronounce on the EAF, because when the explosion had occurred the unit had been immediately placed under maintenance, meaning it was not available earlier. It was a short outage. That doesn’t change that number [of the EAF], because it was not available anyway.”</span>\r\n\r\n<span style=\"font-weight: 400;\">To ensure that SA isn’t thrown deeper into load shedding, Eskom will have to start fixing the shut down Unit 4 or find ways to replace lost generating energy capacity. There is talk that maybe Eskom will take Unit 6 from Kusile Power Station in Mpumalanga, which has not yet been put into service and move it to Unit 4 at Medupi. But Mantshantsha said this will be a long and costly exercise. The best option would be to repair the damage at Medupi.</span><b> DM/BM</b>",
"teaser": "Medupi explosion: Sabotage ruled out, but the R2bn repair price could fall on energy customers",
"externalUrl": "",
"sponsor": null,
"authors": [
{
"id": "23357",
"name": "Ray Mahlaka",
"image": "https://www.dailymaverick.co.za/wp-content/uploads/Ray-Mahlaka.jpg",
"url": "https://staging.dailymaverick.co.za/author/ray-mahlaka/",
"editorialName": "ray-mahlaka",
"department": "",
"name_latin": ""
}
],
"description": "",
"keywords": [
{
"type": "Keyword",
"data": {
"keywordId": "2741",
"name": "Eskom",
"url": "https://staging.dailymaverick.co.za/keyword/eskom/",
"slug": "eskom",
"description": "Eskom is the primary electricity supplier and generator of power in South Africa. It is a state-owned enterprise that was established in 1923 as the Electricity Supply Commission (ESCOM) and later changed its name to Eskom. The company is responsible for generating, transmitting, and distributing electricity to the entire country, and it is one of the largest electricity utilities in the world, supplying about 90% of the country's electricity needs. It generates roughly 30% of the electricity used\r\nin Africa.\r\n\r\nEskom operates a variety of power stations, including coal-fired, nuclear, hydro, and renewable energy sources, and has a total installed capacity of approximately 46,000 megawatts. The company is also responsible for maintaining the electricity grid infrastructure, which includes power lines and substations that distribute electricity to consumers.\r\n\r\nEskom plays a critical role in the South African economy, providing electricity to households, businesses, and industries, and supporting economic growth and development. However, the company has faced several challenges in recent years, including financial difficulties, aging infrastructure, and operational inefficiencies, which have led to power outages and load shedding in the country.\r\n\r\nDaily Maverick has reported on this extensively, including its recently published investigations from the Eskom Intelligence Files which demonstrated extensive sabotage at the power utility. Intelligence reports obtained by Daily Maverick linked two unnamed senior members of President Cyril Ramaphosa’s Cabinet to four criminal cartels operating inside Eskom. The intelligence links the cartels to the sabotage of Eskom’s power stations and to a programme of political destabilisation which has contributed to the current power crisis.",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Eskom",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "6535",
"name": "Medupi Power Station",
"url": "https://staging.dailymaverick.co.za/keyword/medupi-power-station/",
"slug": "medupi-power-station",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Medupi Power Station",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "6539",
"name": "Kusile Power Station",
"url": "https://staging.dailymaverick.co.za/keyword/kusile-power-station/",
"slug": "kusile-power-station",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Kusile Power Station",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "175450",
"name": "Sikonathi Mantshantsha",
"url": "https://staging.dailymaverick.co.za/keyword/sikonathi-mantshantsha/",
"slug": "sikonathi-mantshantsha",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Sikonathi Mantshantsha",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "206570",
"name": "André de Ruyter",
"url": "https://staging.dailymaverick.co.za/keyword/andre-de-ruyter/",
"slug": "andre-de-ruyter",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "André de Ruyter",
"translations": null
}
}
],
"short_summary": null,
"source": null,
"related": [],
"options": [],
"attachments": [
{
"id": "76395",
"name": "",
"description": "",
"focal": "50% 50%",
"width": 0,
"height": 0,
"url": "https://dmcdn.whitebeard.net/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg",
"transforms": [
{
"x": "200",
"y": "100",
"url": "https://dmcdn.whitebeard.net/i/EEqDK5U-CFuuYKNIp2VL9YjKo90=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg"
},
{
"x": "450",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/bCsXLihqPlRhev3PU3sBtNRZ6EM=/450x0/smart/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg"
},
{
"x": "800",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/dVG-rGDUAEfR6omhzLsXgPT6QJ8=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg"
},
{
"x": "1200",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/fkpriKwEiwoZ42c4ssJp_Vu7T7U=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg"
},
{
"x": "1600",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/mRfL3Yi0LLOZ2oIE9Jrofj4Pkv8=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg"
}
],
"url_thumbnail": "https://dmcdn.whitebeard.net/i/EEqDK5U-CFuuYKNIp2VL9YjKo90=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg",
"url_medium": "https://dmcdn.whitebeard.net/i/bCsXLihqPlRhev3PU3sBtNRZ6EM=/450x0/smart/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg",
"url_large": "https://dmcdn.whitebeard.net/i/dVG-rGDUAEfR6omhzLsXgPT6QJ8=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg",
"url_xl": "https://dmcdn.whitebeard.net/i/fkpriKwEiwoZ42c4ssJp_Vu7T7U=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg",
"url_xxl": "https://dmcdn.whitebeard.net/i/mRfL3Yi0LLOZ2oIE9Jrofj4Pkv8=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2021/08/BM-Ray-Medupi-option-1.jpg",
"type": "image"
}
],
"summary": "The cost to repair the damages at Medupi’s Unit 4 could cost between R1.5bn and R2bn. And it could take up to two years to fix the unit. This is a major setback for a power station that already faces cost overruns and delays in completion. \r\n",
"template_type": null,
"dm_custom_section_label": null,
"elements": [],
"seo": {
"search_title": "Medupi explosion: Sabotage ruled out, but the R2bn repair price could fall on energy customers",
"search_description": "<span style=\"font-weight: 400;\">How big a setback is the recent explosion at a unit of Medupi Power Station for SA’s energy security that has long been compromised?</span>\r\n\r\n<span style=\"font-weight:",
"social_title": "Medupi explosion: Sabotage ruled out, but the R2bn repair price could fall on energy customers",
"social_description": "<span style=\"font-weight: 400;\">How big a setback is the recent explosion at a unit of Medupi Power Station for SA’s energy security that has long been compromised?</span>\r\n\r\n<span style=\"font-weight:",
"social_image": ""
},
"cached": true,
"access_allowed": true
}