All Article Properties:
{
"access_control": false,
"status": "publish",
"objectType": "Article",
"id": "1508333",
"signature": "Article:1508333",
"url": "https://staging.dailymaverick.co.za/article/2022-12-22-stefanutti-stocks-comes-back-at-eskom-with-a-r1-14bn-estimated-claim-for-kusile/",
"shorturl": "https://staging.dailymaverick.co.za/article/1508333",
"slug": "stefanutti-stocks-comes-back-at-eskom-with-a-r1-14bn-estimated-claim-for-kusile",
"contentType": {
"id": "1",
"name": "Article",
"slug": "article"
},
"views": 0,
"comments": 0,
"preview_limit": null,
"excludedFromGoogleSearchEngine": 0,
"title": "Stefanutti Stocks comes back at Eskom with a R1.14bn estimated claim for Kusile",
"firstPublished": "2022-12-22 18:52:08",
"lastUpdate": "2022-12-22 18:52:08",
"categories": [
{
"id": "9",
"name": "Business Maverick",
"signature": "Category:9",
"slug": "business-maverick",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/business-maverick/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
},
{
"id": "29",
"name": "South Africa",
"signature": "Category:29",
"slug": "south-africa",
"typeId": {
"typeId": "1",
"name": "Daily Maverick",
"slug": "",
"includeInIssue": "0",
"shortened_domain": "",
"stylesheetClass": "",
"domain": "staging.dailymaverick.co.za",
"articleUrlPrefix": "",
"access_groups": "[]",
"locale": "",
"preview_limit": null
},
"parentId": null,
"parent": [],
"image": "",
"cover": "",
"logo": "",
"paid": "0",
"objectType": "Category",
"url": "https://staging.dailymaverick.co.za/category/south-africa/",
"cssCode": "",
"template": "default",
"tagline": "",
"link_param": null,
"description": "Daily Maverick is an independent online news publication and weekly print newspaper in South Africa.\r\n\r\nIt is known for breaking some of the defining stories of South Africa in the past decade, including the Marikana Massacre, in which the South African Police Service killed 34 miners in August 2012.\r\n\r\nIt also investigated the Gupta Leaks, which won the 2019 Global Shining Light Award.\r\n\r\nThat investigation was credited with exposing the Indian-born Gupta family and former President Jacob Zuma for their role in the systemic political corruption referred to as state capture.\r\n\r\nIn 2018, co-founder and editor-in-chief Branislav ‘Branko’ Brkic was awarded the country’s prestigious Nat Nakasa Award, recognised for initiating the investigative collaboration after receiving the hard drive that included the email tranche.\r\n\r\nIn 2021, co-founder and CEO Styli Charalambous also received the award.\r\n\r\nDaily Maverick covers the latest political and news developments in South Africa with breaking news updates, analysis, opinions and more.",
"metaDescription": "",
"order": "0",
"pageId": null,
"articlesCount": null,
"allowComments": "1",
"accessType": "freecount",
"status": "1",
"children": [],
"cached": true
}
],
"content_length": 3078,
"contents": "<span style=\"font-weight: 400;\">In June 2020, Eskom alleged that it had overpaid around R4-billion to various contractors involved in the construction of the 4,800MW coal-fired Kusile Power Station. The overpaid amounts were broken down into R1-billion each for Stefanutti, multinational ABB, and Tubular Construction Projects, with another R735-million to Tenova Mining and Minerals and another R180-million to “various site service contractors”.</span>\r\n\r\n<span style=\"font-weight: 400;\">The construction of the power station was initially expected to take six years to complete at a cost of R81-billion, but since work kicked off in 2008, costs have risen to R161-billion and in June this year, Eskom said it expected Kusile to be fully operational by May 2024, 10 years later than initially expected.</span>\r\n\r\n<span style=\"font-weight: 400;\">Stefanutti and Eskom entered into an interim arrangement in February 2020 to appoint independent experts to determine the causes, duration and to quantify all delay events up to 31 December 2019. They agreed that the Dispute Adjudication Board would then issue a final, binding decision, which Eskom and Stefanutti would abide by.</span>\r\n\r\n<span style=\"font-weight: 400;\">Since August 2021, Eskom has paid the company R110-million. However, Stefanutti this week released an update revealing to shareholders that it had submitted an overarching preliminary and general cost claim and a subcontractor overarching preliminary and general cost claim of R337-million and R194-million respectively.</span>\r\n\r\n<b>Visit </b><a href=\"https://www.dailymaverick.co.za/?utm_source=direct&utm_medium=in_article_link&utm_campaign=homepage\"><b><i>Daily Maverick’s</i></b><b> home page</b></a><b> for more news, analysis and investigations</b>\r\n\r\n<span style=\"font-weight: 400;\">The company also submitted to experts a provisional construction cost claim of R438-million and a finance cost claim of R171-million on 20 December, which means the total quantum of the provisional claims submitted is R1.14-billion.</span>\r\n\r\n<span style=\"font-weight: 400;\">Stefanutti anticipates that it will submit the remaining claims relating to commissioning costs and interest to the experts in the new year and that the adjudication board will issue a binding decision during the second quarter of 2023. Both Eskom and Stefanutti will still have the right, at that point, to issue a notice of dissatisfaction and refer the dispute to arbitration.</span>\r\n\r\n<span style=\"font-weight: 400;\">The issue is not small for Stefanutti, which reported a 9% fall in contract revenue to R2.9-billion for the six months to end December and absorbed restructuring and abnormal legal fees of R28-million in the reporting period. The group’s order book is currently R6.3-billion of which R1.6-billion arises from work beyond South Africa’s borders.</span>\r\n\r\n<span style=\"font-weight: 400;\">Chief executive Russell Crawford says the company continues to be negatively affected by disruptive and unlawful activities by certain communities and informal business forums in several areas of South Africa.</span>\r\n\r\n<span style=\"font-weight: 400;\">“The weakened post-Covid 19 economy has been further exacerbated by the Russia and Ukraine conflict, resulting in increased interest and inflation rates, which drives increases in raw material and fuel costs. These increases, together with continuous power supply disruptions and disruptive floods in KwaZulu-Natal in April 2022, continued to put pressure on the group’s operations and that of its customers,” he says. </span><b>BM/DM</b>",
"teaser": "Stefanutti Stocks comes back at Eskom with a R1.14bn estimated claim for Kusile",
"externalUrl": "",
"sponsor": null,
"authors": [
{
"id": "64897",
"name": "Neesa Moodley",
"image": "https://www.dailymaverick.co.za/wp-content/uploads/2023/09/NeesaMoodley.jpeg",
"url": "https://staging.dailymaverick.co.za/author/neesa-moodley/",
"editorialName": "neesa-moodley",
"department": "",
"name_latin": ""
}
],
"description": "",
"keywords": [
{
"type": "Keyword",
"data": {
"keywordId": "2741",
"name": "Eskom",
"url": "https://staging.dailymaverick.co.za/keyword/eskom/",
"slug": "eskom",
"description": "Eskom is the primary electricity supplier and generator of power in South Africa. It is a state-owned enterprise that was established in 1923 as the Electricity Supply Commission (ESCOM) and later changed its name to Eskom. The company is responsible for generating, transmitting, and distributing electricity to the entire country, and it is one of the largest electricity utilities in the world, supplying about 90% of the country's electricity needs. It generates roughly 30% of the electricity used\r\nin Africa.\r\n\r\nEskom operates a variety of power stations, including coal-fired, nuclear, hydro, and renewable energy sources, and has a total installed capacity of approximately 46,000 megawatts. The company is also responsible for maintaining the electricity grid infrastructure, which includes power lines and substations that distribute electricity to consumers.\r\n\r\nEskom plays a critical role in the South African economy, providing electricity to households, businesses, and industries, and supporting economic growth and development. However, the company has faced several challenges in recent years, including financial difficulties, aging infrastructure, and operational inefficiencies, which have led to power outages and load shedding in the country.\r\n\r\nDaily Maverick has reported on this extensively, including its recently published investigations from the Eskom Intelligence Files which demonstrated extensive sabotage at the power utility. Intelligence reports obtained by Daily Maverick linked two unnamed senior members of President Cyril Ramaphosa’s Cabinet to four criminal cartels operating inside Eskom. The intelligence links the cartels to the sabotage of Eskom’s power stations and to a programme of political destabilisation which has contributed to the current power crisis.",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Eskom",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "6539",
"name": "Kusile Power Station",
"url": "https://staging.dailymaverick.co.za/keyword/kusile-power-station/",
"slug": "kusile-power-station",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Kusile Power Station",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "207277",
"name": "Stefanutti Stocks",
"url": "https://staging.dailymaverick.co.za/keyword/stefanutti-stocks/",
"slug": "stefanutti-stocks",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Stefanutti Stocks",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "370426",
"name": "overpayment",
"url": "https://staging.dailymaverick.co.za/keyword/overpayment/",
"slug": "overpayment",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "overpayment",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "383924",
"name": "Neesa Moodley",
"url": "https://staging.dailymaverick.co.za/keyword/neesa-moodley/",
"slug": "neesa-moodley",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Neesa Moodley",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "392975",
"name": "legal dispute",
"url": "https://staging.dailymaverick.co.za/keyword/legal-dispute/",
"slug": "legal-dispute",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "legal dispute",
"translations": null
}
},
{
"type": "Keyword",
"data": {
"keywordId": "392976",
"name": "Dispute Adjudication Board",
"url": "https://staging.dailymaverick.co.za/keyword/dispute-adjudication-board/",
"slug": "dispute-adjudication-board",
"description": "",
"articlesCount": 0,
"replacedWith": null,
"display_name": "Dispute Adjudication Board",
"translations": null
}
}
],
"short_summary": null,
"source": null,
"related": [],
"options": [],
"attachments": [
{
"id": "6172",
"name": "",
"description": "",
"focal": "50% 50%",
"width": 0,
"height": 0,
"url": "https://dmcdn.whitebeard.net/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg",
"transforms": [
{
"x": "200",
"y": "100",
"url": "https://dmcdn.whitebeard.net/i/FWq0L3yMu8CFUpVaQP4kG2PJLYg=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg"
},
{
"x": "450",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/JgY80uuYW_W61rqWk1M_exH0wzk=/450x0/smart/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg"
},
{
"x": "800",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/pSXn3PefdtseQstJIbkkv1OYdlY=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg"
},
{
"x": "1200",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/AhkdvDxTvqR5DNc1id1etp5J5v0=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg"
},
{
"x": "1600",
"y": "0",
"url": "https://dmcdn.whitebeard.net/i/fPyvDpOaqv5gSjDXPmPz5fLVi-g=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg"
}
],
"url_thumbnail": "https://dmcdn.whitebeard.net/i/FWq0L3yMu8CFUpVaQP4kG2PJLYg=/200x100/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg",
"url_medium": "https://dmcdn.whitebeard.net/i/JgY80uuYW_W61rqWk1M_exH0wzk=/450x0/smart/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg",
"url_large": "https://dmcdn.whitebeard.net/i/pSXn3PefdtseQstJIbkkv1OYdlY=/800x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg",
"url_xl": "https://dmcdn.whitebeard.net/i/AhkdvDxTvqR5DNc1id1etp5J5v0=/1200x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg",
"url_xxl": "https://dmcdn.whitebeard.net/i/fPyvDpOaqv5gSjDXPmPz5fLVi-g=/1600x0/smart/filters:strip_exif()/file/dailymaverick/wp-content/uploads/2022/12/GettyImages-1241195076.jpg",
"type": "image"
}
],
"summary": "The beleaguered power utility Eskom may be forced to back down on its claim that construction company Stefanutti Stocks was overpaid to the tune of R1bn for the Kusile power project and instead find itself liable to pay Stefanutti R1.14bn.",
"template_type": null,
"dm_custom_section_label": null,
"elements": [],
"seo": {
"search_title": "Stefanutti Stocks comes back at Eskom with a R1.14bn estimated claim for Kusile",
"search_description": "<span style=\"font-weight: 400;\">In June 2020, Eskom alleged that it had overpaid around R4-billion to various contractors involved in the construction of the 4,800MW coal-fired Kusile Power Station. T",
"social_title": "Stefanutti Stocks comes back at Eskom with a R1.14bn estimated claim for Kusile",
"social_description": "<span style=\"font-weight: 400;\">In June 2020, Eskom alleged that it had overpaid around R4-billion to various contractors involved in the construction of the 4,800MW coal-fired Kusile Power Station. T",
"social_image": ""
},
"cached": true,
"access_allowed": true
}